LOW ALLOY STEEL
Low-alloy steels are often chosen for MIM due to their high strength and ductility.
MIM-4605 is a low alloy steel with excellent strength,
toughness
and corrosion resistance.
Compared with MIM-4605 (as sintered), MIM-4605 (quenched & tempered, high hardness) increases the ultimate strength and yield strength of the product.
MIM-Fe2Ni is a magnetic memory alloy composed of iron, nickel,
chromium, copper, aluminum
and other elements.
It is a magnetic material prepared by Metal Injection Molding (MIM), mainly composed of iron and nickel, and the nickel content is 8%.
MIM-2200 has excellent formability, superior mechanical properties, corrosion resistance and lubricity.
Yes, this is a routine operation for most companies before making an inquiry.
We have metal 3D printing equipment and can provide sample 3D printing.
3D drawings allow engineers to better understand the structure of the product, and 2D documents can provide more information, including materials, tolerances, surface treatment, etc. More detailed information is conducive to more accurate quotation by engineers.
In the case of detailed inquiry drawings and information, it usually only takes 2-3 days for us to give you a detailed quotation, including product price and mold price.
After confirming the order, we usually take 5-7 days to prepare the DFM report of the product. After confirmation, we spend 25 days to complete the mold, and provide T1 samples to customers for testing in the following 10-15 days.
If there is a problem with the test, we will re-sample it for free based on the feedback and provide a suitable sample.
MIM products MOQ 2000 PCS,
CNC products MOQ 2000 PCS,
Alu die casting, MOQ 2000 PCS
PM product MOQ 5000 PCS
Typically, the lead time for processing and submitting samples is 30 days. However, according to the order quantity and special requirements of customers, we can extend or shorten the delivery cycle accordingly.
1-year product warranty
World-class testing equipment
30+QC Workers
Key sizes 100% checking before shipment
ISO9001+IATF16949
Usually T/T is used as the payment method
Mold: 50% deposit, 50% payment after confirming the sample.
Bulk production: 30% deposit, 30% see bill of lading Copy, pay 70% balance.